don't insert so many links idiot

Review Cycle for UMM 2.0 Public Draft has been extended

The UMM 2.0 Specifications (both, foundation and base) are currently in ODP Step 5, which means they are currently a public draft. The review cycle for the draft has been extended to 31st October – that’s one week before the forum meeting in Senegal. We kindly encourage our stakeholders to go through the draft and file comments if needed.

The UMM 2.0 Public Draft (and always the version of the UMM 2.0 spec) is located at

http://www.untmg.org/umm/spec/foundation/2_0

Leave a comment

You must be logged in to post a comment.